1. Break down responsibility and manage docking.
Finely divide the responsibilities of the main and auxiliary control operators, strengthen the monitoring and recording of equipment operating parameters, and provide the basis for the adjustment of equipment operating conditions. Establish the operation relationship of the main and auxiliary equipments of the team, the value, and the department to coordinate the main and auxiliary equipments, make the adjustment of the main and auxiliary equipments consistent, and formulate technical measures with strong operability, and clarify the adjustment range and adjustment methods of various parameters.
Second, tamping inspections, measures docking.
Increase the frequency of inspections within the value, strengthen the attention of the indicators of the supervisors, timely discover the poor operating conditions of the equipment, refine and improve the emergency response measures, and make the operators accurately judge and implement the recovery means when the equipment parameters are abnormal, and control the operation status of the equipment. To ensure the output of the equipment.
Third, regular maintenance, prevention and control docking.
In order to maintain the good running condition of the equipment, the company has strengthened the management of the regular work of the dust removal equipment, and adjusted the content and intensity of the regular work according to the operating conditions, so that the regular work is more scientific and strictly prevented from being caused by the timely input of the cleaning equipment. The dust removal efficiency is reduced, and the strict control of the prevention and control measures is achieved.
After the implementation of the main and auxiliary equipment management docking measures, the dust removal equipment realized the scientific linkage with the host computer, avoiding the wind rushing phenomenon caused by the poor dust removal efficiency.
Customed Railway Construction Power Pack
Railway Construction Power Pack,Power Pack,Construction Power Pack,Railway Power Pack
GRH , https://www.grhcn.net