Phase V Land Acquisition, Demolition and Resettlement Project

Land acquisition, house demolition and relocation project in the fifth period (2011-2012, 800 million yuan)
Project Name: Phase 5 Land Acquisition, House Demolition and Resettlement Project of Luoxia Villa Progress: Eco-impact assessment construction period: 2011-2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, cranes .

Project Description:
The project is located on the northeastern side of the intersection of Ruijing Road and Datong Road of Taihu New Town. The project has a total land area of ​​150658 square meters, of which the constructable land area is 142857 square meters, the total construction area is 474490 square meters, and the ground construction area is 371330 square meters. , The underground building area is 103,160 square meters, the building density is 15.7%, the building volume rate is 2.6, the green space rate is 33.5%, and the proportion of small-sized apartment buildings below 90 square meters is 54.3%. The total investment of the project is 800 million yuan.

Construction Unit: Wuxi Binhu Economic and Technological Development Zone Co., Ltd. Postal address: Gaoyun Road, Binhu Economic and Technological Development Zone, Wuxi City Post Code: 224005
Contact: Fan Pengfei Telephone

Design Unit: Nanjing Saite Environmental Engineering Co., Ltd. (EIA)
Postal address: No. 8 Jiangwang Temple Street, Nanjing 210042
Telephone (Wuxi Office)

Related Developments: Tower Crane Infrastructure Project

Engine Spare Parts

Elements , Filter Element ,Oil Filter ,Heating Equipment

Diesel Engine Water Pump,Generator Sets Co., Ltd. , http://www.nbdieselengine.com

Posted on