This paper reviews the high arsenic ore Zn-Ag lead-zinc ore roof design process.
The gold metal primary ore minerals: sphalerite, galena, arsenopyrite, native silver, silver spiro sulfur and vanadium lead, white lead ore and the like. The ore contains 0.74% P6, 1.96% Zn, 1429/t Ag and 0.25% As. The mineral is unevenly embedded in fine particles, and the arsenopyrite is densely combined with galena. It is necessary to finely grind the lead concentrate to 98% and less than 38 μm in order to reduce the arsenic content of the lead concentrate to less than 0.5%.
The research department has studied five processes and designed a process that uses partial priority flotation and lead bismuth re-grinding. The test results of the five processes and the flow chart and operating conditions used in the design are introduced. The design indicators are as follows:
The reason for adopting this process is discussed in the paper.
(Ling from "Engineering Design and Research" 1986, No3)
Custom Goose Blade Feather Badminton,Special Badmintons,Sports Equipment Training Duck Ball,Customized Goose Blade Feather Badmintons
ZHEJIANG JUNYE SPORTS GOODS CO.,LTD. , https://www.cnjunbei.com