Project Title: Beijing Miyun Circular Economy Headquarters Base Construction Project (March 2012-December 2014, 150 million)
Progress stage: Project approval Verification area: Beijing Construction period: March 2012 - December 2014 Major equipment: cranes, building materials, exterior wall decoration materials, window glass, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paints Coatings, Valve Components, Ceramic Products, Water Supply and Drainage Systems, Fire Fighting Systems, Pipe Fittings, Water Supply Equipment, Outdoor Drainage, Building Electrical, Lighting Fixtures, Low Voltage Electrical Appliances, Wire and Cable, Low Voltage Systems, Lightning Protection Systems, Buck Distribution Cabinets, Steel structure. (for reference only)
Project Description:
The project is located in Zone B, Development Zone, Miyun County, Beijing, an industrial development with a total construction area of ​​approximately 106,000 square meters, including: service centers, talent apartments, production plants, and warehouses. The total investment of the project is 150 million yuan.
Progress stage: Project approval Verification area: Beijing Construction period: March 2012 - December 2014 Major equipment: cranes, building materials, exterior wall decoration materials, window glass, sanitary ware, elevators, cranes, waterproof anti-corrosion materials, paints Coatings, Valve Components, Ceramic Products, Water Supply and Drainage Systems, Fire Fighting Systems, Pipe Fittings, Water Supply Equipment, Outdoor Drainage, Building Electrical, Lighting Fixtures, Low Voltage Electrical Appliances, Wire and Cable, Low Voltage Systems, Lightning Protection Systems, Buck Distribution Cabinets, Steel structure. (for reference only)
Project Description:
The project is located in Zone B, Development Zone, Miyun County, Beijing, an industrial development with a total construction area of ​​approximately 106,000 square meters, including: service centers, talent apartments, production plants, and warehouses. The total investment of the project is 150 million yuan.
Construction Unit: Green Mountain River Environmental Protection Investment (Beijing) Co., Ltd. Postal address: No. 69, Repulse Bay, Juncheng, Nankai District, Tianjin Postcode: 300113
Contact: Hua Ming Telephone
Related Developments: Tower Crane Infrastructure Project
Electrodes Cutting Blades,Li-Ion Battery Seprarator Cutter,Li-Ion Battery Membrane Cutter,Pole Piece Slicing Blade
Guangdong Rixin Precision Technology Co., Ltd. , https://www.nissonmold.com