·The automotive industry will enter an accelerated adjustment period

Liu Shijin, deputy director of the Development Research Center of the State Council, said at the Auto 50 Forum held in Beijing recently that China's auto industry will enter an accelerated adjustment period, and some enterprises will be eliminated and merged.

In 2011, China’s car ownership exceeded 100 million for the first time, second only to the United States. But it is also in this year that China's auto market has experienced a 25% rapid growth for a decade, and its annual growth rate has dropped to 2.5%. At the same time, the pressure on overcapacity in the auto industry is very prominent.

At the beginning of this year, the "Industrial Transformation and Upgrading Plan (2011-2015)" issued by the State Council proposed to improve the industrial concentration of the automotive industry, and gave clear indicators, requiring the concentration of the top 10 companies in the automotive industry from 2010. 82.2% increased to 90% in 2015. It is widely expected in the industry that the rapid development of the automobile industry will return to rationality, and the policy will push for a new round of industrial adjustment. The whole industry will usher in a round of reshuffle.

Construction Hoist Part

Construction hoist is vertical transport machinery driving by pinion and rack, mainly used on construction site for transportation of personal and materials. As a permanent or sub-permanent external elevator, it also applies to store house, dock, high tower, high chimney, etc.

There are single cage and double cages hoist. According to the need gets rid of one cage of double cages the hoist will be changed to single cage hoist. SC Construction Hoist is equipped with reliable electrical and mechanical safety device. It is efficient and safety vertical transporting equipment.


Spare parts for a construction hoist may include:

1. Wire Rope: These are used to lift and lower the load in the hoist. They may need to be replaced if they become worn or damaged.

2. Construction Hoist Motor: The motors in the hoist are responsible for powering the lifting and lowering mechanism. Spare motors may be needed in case of motor failure.

3. Electromagnet Brake: The hoist is equipped with brakes to hold the load in place. Spare brake pads or other brake components may be necessary for maintenance or repair.

4. Control panels: The control panel is used to operate the hoist and control its movements. Spare control panels or control panel components may be required in case of malfunction.

5. Safety devices: Construction hoists are equipped with various safety devices, such as limit switches, overload protection, and emergency stop buttons. Spare safety devices may be needed to ensure the hoist operates safely.

6. Bearings and bushings: These components help reduce friction and facilitate smooth movement in the hoist. Spare bearings and bushings may be necessary for maintenance or repair.

7. Electrical components: Various electrical components, such as relays, switches, and fuses, may need to be replaced if they fail or become damaged.

8. Pulleys and sheaves: These components are used to guide and redirect the wire ropes in the hoist. Spare pulleys and sheaves may be required if they become worn or damaged.

9. Hooks and shackles: The hooks and shackles are used to attach the load to the hoist. Spare hooks and shackles may be needed if they become worn or damaged.

10. Construction Hoist Steel Structure parts: Spare structural components, such as beams or mast sections, may be required for repair or replacement if they become damaged or worn over time.



Construction Hoist Parts,Passenger Hoist Rope Pulley,Construction Hoist Roller,Electromagnet Brake,Spare Parts Counter Roller

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.sytopkittowercrane.com

Posted on