Smooth apperance
Good quality
Mould Manufacture Flow Chart | |||||||
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed. | Â | ||||||
 | |||||||
 | |||||||
 | |||||||
 | |||||||
 | |||||||
Following information is essential for your better understanding on our moulds | |||||||
 |  |  |  |  |  |  |  |
Name | Description | Â | Â | ||||
Products' infomation we need to make quotation | Clear Pics/material/size/weight/wall thickness/targetting quantity and etc. | Â | Â | ||||
Mould Material | 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc | Â | Â | ||||
Mould Base | LKM, HASCO ect. | Â | Â | ||||
Cavity | Single/multi | Â | Â | ||||
Runner | Hot/cold | Â | Â | ||||
Mould Design | 3D/2D Drawing | Â | Â | ||||
Design Days | 3 days | Â | Â | ||||
Design Software | UG, PROE, CAD, CAE, CAM, CAXA ect | Â | Â | ||||
Plastic Material | PP, PC, PS, PE, PU, PVC, ABS, PMMA ect | Â | Â | ||||
Mould Life | 300, 000-3, 000, 000 shots | Â | Â | ||||
Injection System | Pin-point-gate | Â | Â | ||||
Polish System | Mirror Polish | Â | Â | ||||
Payment | 40% of Deposit by T/T, 60% of Balance by T/T | Â | Â | ||||
Delivery Time | 15-60days | Â | Â | ||||
Specification | Depends on customers requirements | Â | Â | ||||
 |  |  |  |  |  |  |  |
Business Step | |||||||
1. R& D | We support customer R& D. Make the files or improve the design if you needed | ||||||
↓ ↓ ↓ | |||||||
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓ ↓ ↓ | |||||||
3. Negotiation | The quality, price, material, delivery time. payment item. ect | ||||||
↓ ↓ ↓ | |||||||
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓ ↓ ↓ | |||||||
5. Mould | According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days | ||||||
↓ ↓ ↓ | |||||||
6. Mould Testing | When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. | ||||||
↓ ↓ ↓ | |||||||
7. Sample shoot | If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory | ||||||
 ↓ ↓ ↓ | |||||||
8. Delivery | Delivery goods by sea or by air, according customers requirement | ||||||
 |  |  |  |  |  |  |  |
Industrial synchronous belt applies the superior synthetic neoprene imported
from Japan as main raw material. It matches with multiple auxiliary materials with
various uses. Skeleton uses the superior glass fiber cord imported from japan. Tooth
face of the belt adopts nylon 66 high spandex for protection.
Synchronous belt drive is a novel drive mode that utilizes pulley gear meshing to
transfer motive power. It has accurate synchronous drive function. It needs no
lubrication without slip differential nor pollution and with little noise. Drive efficiency
reaches to 0.98. Speed ratio range can fulfill 1:10. Allowable linear speed can attain
50m/s. Drive efficiency ranges from several hundred watts to several kilowatts. It
suits multi-axial drive. It features as fine dynamic flex resistance, good anti-cracking
properties, superior ozone-proof performanca, sound heat-resistance and wearability etc.
T Toothed Rubber Timing Belt,Synchronous Timing Belt,Small Belt Conveyor,Rubber Belts
Jiangsu Bailite Transmission Technology Co., Ltd , https://www.bailitebelt.com