Fitting Pipe Hydraulic Hose Fitting Brass Material, Wholesale Chinese Fitting Pipe

Model NO.: 7048
Trademark: D&R
Specification: 1/2"-1′′
Origin: Zhejiang, China
HS Code: 7412209000
Fitting Pipe Hydraulic Hose Fitting Brass Material, Wholesale Chinese Fitting Pipe

Feature:

Item No.

 DR7048

Body Material

 Brass

Connection End  Thread
Working Pressure  2.0Mpa
Female Thread Connections Comply With  ISO 228, NPT, BSP
Handle Color  Customized
Working Temperature  -10ºC ≤ t≤ 120ºC
Nominal Pressure  2.0Mpa
Surpace  Nickel Plated

Fitting Pipe Hydraulic Hose Fitting Brass Material, Wholesale Chinese Fitting Pipe
Fitting Pipe Hydraulic Hose Fitting Brass Material, Wholesale Chinese Fitting Pipe
Fitting Pipe Hydraulic Hose Fitting Brass Material, Wholesale Chinese Fitting Pipe
Fitting Pipe Hydraulic Hose Fitting Brass Material, Wholesale Chinese Fitting Pipe
Fitting Pipe Hydraulic Hose Fitting Brass Material, Wholesale Chinese Fitting Pipe
FAQ:

Q:What is the quality of the valve?
A: We have more than 15 years in this filed, and quality guarantee 18. 

Q:Can you help to design when there is only sketch of drawing?
A: Yes, please provide us the requirement of design, we will design the rest of parts, ODM is available.

Q:What is the form of packaging for valve and fittings? Can it be customized?
A: we adopt standard export packaging. Polybag in carton box packed in pallet. 
And you may need to bear the extra charge for customized packaging.

Q:Can I choose to partially ship by air if the products are in urgent need?
A: Yes, it is one option; you may need to afford the air freight charges.
 
Q:When will I receive the valve after the payment?
A: It is usually 30days for production with MOQ. And there is extra shipment time that depends on which seaport to ship to, usually 15-30days for ocean shipping, and 4-7days for air shipping.

Anchorage Frame

A Tower Crane anchorage frame is a structural component used to secure a tower crane to the ground or a building during its operation. It is typically made of steel and designed to withstand the high loads and forces exerted by the crane.

The anchorage frame consists of a base plate or foundation, which is securely attached to the ground or building structure. It also includes vertical support beams or columns that provide stability and strength to the frame. These columns are connected to the base plate and extend upwards to support the tower crane.

The anchorage frame is designed to distribute the loads from the crane's operation evenly and safely to the ground or building structure. It must be able to withstand the weight of the crane, the loads lifted by the crane, wind forces, and other external factors.

The design and construction of a tower crane anchorage frame must comply with local building codes and regulations. It is typically engineered by a structural engineer to ensure its strength and stability.

Proper installation and regular inspections of the anchorage frame are essential for the safe operation of a tower crane. Any signs of damage or deterioration should be addressed immediately to prevent accidents or structural failure.


Jacking Part Anchorage Frame,Tower Crane Anchorage Frame,Mast Section Anchorage Frame,Anchorage Frame For Tower Crane,Tower Crane Anchor

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.sczenghui.com

Posted on